BIPAD incidents
NEOC incident/loss records (dead/missing/injured/families/houses per ward) — the Bhote Koshi event is NOT entered yet (30 Aug); wired for when it is
NEOC incident/loss records (dead/missing/injured/families/houses per ward) — the Bhote Koshi event is NOT entered yet (30 Aug); wired for when it is
hydrograph per corridor station — BIPAD station ids 171 Rasuwagadi, 74 Bhote Koshi@Syabrubesi, 49 Langtang@Syabrubesi, 137 Betrawati, 79 Phalakhu, 105 Dhunche, 281 Galchi, 261 Malekhu, 67 Kali Khola, 25 Devghat, 35 Bhorle; newest 60 readings each
live DHM gauge mirror — level, warning/danger, timestamp, camera image URL
Tibet-side statements, Chinese nationals missing
barrier-lake consultations, response levels, new upstream risks
Tibet-side coverage (the only side with Gyirong counts)
DAO Dhading / Chitwan / Gorkha homepages — same CMS as DAO Rasuwa; no flood posts found on 30 Aug
rescued persons (~1,436) + rescued foreigners (~170) with rescue location
same as river-stations, direct from DHM (no coordinates; silent stations have no timestamp)
official 3-day forecast, heavy-rain warnings by province
national bridge inventory — join key for "bridges lost" claims
health-sector sitrep (treated/referred/deaths in care, facility damage)
bodies + foreigner nationality table (total/found/missing per country)
Daily Disaster Bulletin (national incident table)
numbered Situation Reports (Canva PDFs, text-extractable) + morning situation updates (scanned, OCR) + lists (PII)
named rescued register; counts; 21 rescue sites + 11 stationing sites with centroids
official notices mirrored from nepal.gov.np
geocoded help requests (problemType, affectedCount, urgency, district/municipality/ward, Point)
person reports with fullName, locationText, daoOffice, source, status, createdAt
totals — persons lost/found/rescued, last24h, withoutContact, help requests/offers
unidentified bodies (photo, sex, place found), missing, found
NDRRMA family-intake records (missing/found/safe/rescued)
English road/hazard status, citizen guidance
event metadata, Sendai fields, GLIDE FL-2026-000167-NPL (note second GLIDE FF-2026-000162-NPL elsewhere)
full text of OCHA flash updates, UN RC/HCT sitreps, WFP/IOM/WVI/NRCS updates (per-district and per-site numbers)
UN RCO flash updates, OCHA/IOM/WFP/IFRC/NRCS sitreps, UNOSAT maps
AOI list, product versions/status, stats; products zip at https://rapidmapping.emergency.copernicus.eu/backend/EMSR927/EMSR927_products.zip (GET only)
every HDX dataset touching the event (HOT, UNOSAT, EMSR927, Microsoft, HeiGIT, GLIDE)
flood extent, destroyed features, helipads, health, police, admin, TM boundaries, Vantor mosaic
mapping/validation progress per project (63069, 63102, 63235, 63236)
UNOSAT impacted-area polygon (37 km²)
NESRA FloodWatch analytical layers (3,216 buildings, 772 flood polygons)
drone/satellite uploads — watch for first post-event drone orthomosaic
24 scenes (PlanetScope, SkySat 0.8 m, Pelican 0.55 m)
independent confirmation of USGS events (gfz2026qrfy Mw 5.69 landslide)
NTC tower-restoration notices (the primary source behind ntc_restoration_articles)
site-by-site telecom restoration — best reached/unreached proxy
hourly precip + low cloud → flying windows
landslide-type events (us7000tbwb M5.2 02:52Z; us7000tc90 M4.2 06:00Z) — a new one = a new collapse/breach
richest Nepali per-place stream (Timure 48×, Dhunche 27×…)
volume monitor + Nepali-outlet discovery (onlinekhabar/ratopati/ekantipur); misses KP/THT
enumerator for non-RSS outlets (KP, THT, Republica, ekantipur, Setopati, Nagarik, Xinhua EN, Global Times, AP, Guardian, AJ)
Nepali + English news stream; headlines encode place+count+status
ICIMOD (cause/warning), INSEC (rights monitor — missing by home district), Radio Nepal NE, Khabarhub NE, Setopati NE, Himal, Deshsanchar
curated timeline; 174 external links as crawl seeds; revision stream as change detector
IPPAN (hydropower producers) — "934 unaccounted across 11 projects" reached the press, nothing published on the site
MoHA notices (only the unclaimed-bodies management directive is flood-related so far)
Nepal Red Cross situation updates 1–3 + press release — relief, hospital beds, warehouses, personnel quoted from NDRRMA
normalised copies of official lists + family registry; 716-commit history of list changes