Skip to content
Police 1155 · Tourist Police 1144 · MoFA ECR +977-9744441227 · Red Cross 1130 · Disaster line 1234
Not a substitute for official reporting.

Numbers

YOUR PART

A little information could save a life.

Hundreds of people are still out of contact5 d 8 h 47 min since the waveEvery hour matters.

people here now0today42 MINsince last update

The numbers, side by side

Swipe sideways for more columns →

SourceNDRRMANepal PoliceMoFADept of TourismOPMCM portal
Dead
781
+106 since yesterday
Sitrep #9 · publication 391 as of 30 Aug 18:30 NPT
919
KATHMANDU: A total of 919 bodies have been recovered following the devastating flood in Rasuwa, according to Nepal Police. as of 31 Aug 16:09 NPT
72
bodies recovered as of 30 Aug 14:00 NPT
Missing / out of contact
2,502
+4 since yesterday
Sitrep #9 · publication 391 as of 30 Aug 18:30 NPT
197
The Provincial Police Office said that 197 people are still unaccounted for. as of 31 Aug 13:23 NPT
511
12,224
open lost-person reports · as of 31 Aug 16:41 NPT
Rescued
9,435
+1,921 since yesterday
Sitrep #9 · publication 391 as of 30 Aug 18:30 NPT
2,762
हालसम्म 2762 जनाको उद्धार गरिएको प्रहरीले जनाएको छ । as of 30 Aug 17:00 NPT
121
289
नेपाल पर्यटन बोर्डले दिएको जानकारी अनुसार बुधबार बिहान भोटेकोशीमा आएको बाढीमा परेर सम्पर्कविहिन भएकामध्ये हालसम्म 289 विदेशी पर्यटकको उद्धार गरिएको हो । as of 30 Aug 21:57 NPT
10,067
open lost-person reports · as of 31 Aug 16:41 NPT

Each agency counts something different. Why they differ

What happened, in numbers

The first hours

26 Aug 2026 · reconstructed from DHM gauges, USGS and NDRRMA reports
  1. 08:37Barrier lake site (Chhochen Khola–Purepu Tsangpo confluence)

    A ~600 m section of glacier and rock falls ~1,200 m into the Lhende Khola. Seismometers record it as a magnitude-5.2 event (USGS us7000tbwb).

    USGS
  2. 08:40Gyirong (Kerung) Port

    The surge reaches Gyirong (Kerung) Port about seven minutes after the collapse — roughly 190 km/h over the first 22 km.

    ICIMOD / Kathmandu Post
  3. 08:40Rasuwagadhi

    Last reading from the Rasuwagadhi river gauge (1.62 m) before it is destroyed. The border post, customs yard and the Miteri bridge are swept away.

    DHM river watch
  4. 08:50Syabrubesi

    Syabrubesi gauges go offline (Bhote Koshi 3.80 m, Langtang Khola 2.81 m). The bazaar, lodges and helipad are hit.

    DHM river watch
  5. 09:00Betrawati

    Rasuwa DAO and the Betrawati gauge-keeper phone the Flood Forecasting Division; the warning chain starts by telephone.

    DHM technical report
  6. 09:15

    DHM sends a warning SMS to 679,295 subscribers in Rasuwa, Nuwakot, Dhading and Chitwan. Workers at Upper Trishuli-1 report an alert ~30 s before the wave.

    DHM technical report
  7. 09:20Betrawati

    Betrawati: last gauge reading (3.55 m); the bridge that links Rasuwa to Nuwakot is gone minutes later.

    DHM river watch
  8. 10:28Galchhi

    Galchhi alert: the Trishuli rises ~9 m in 30 minutes, 60 km downstream. Prithvi Highway and Mugling–Narayanghat put on high alert.

    ICIMOD / DHM
  9. 26 Aug 11:00

    NDRRMA situation report: 144 dead

    NDRRMA
  10. 11:26Malekhu

    Malekhu (Furke Khola) crosses the warning level; at 11:40 it reads 10.48 m — above danger — and the gauge dies. The bridge is destroyed at 11:43.

    BIPAD river stations
  11. 11:45Barrier lake site (Chhochen Khola–Purepu Tsangpo confluence)

    A second mass movement (magnitude 4.2, USGS us7000tc90) at the same site — the window in which the first barrier lake is thought to have breached.

    USGS
  12. 13:00Devghat

    The flood passes Mugling; Devghat is evacuated. Devghat reads 4.76 m at 13:30.

    DHM technical report
  13. 14:14

    Trishuli at Kali Khola peaks at 12.3 m (danger level 12.1 m).

    DHM river watch
  14. 16:00Devghat

    Narayani at Devghat peaks at 6.57 m (~5,850 m³/s). Bodies will later be recovered up to ~240 km downstream, into Uttar Pradesh.

    DHM river watch
Later
  1. 27 Aug 10:00

    NDRRMA situation report: 389 dead (+245)

    NDRRMA
  2. 28 AugBarrier lake site (Chhochen Khola–Purepu Tsangpo confluence)

    The lower barrier lake overtops; rescue is suspended for ~3 hours and crews pull back 1 km. Downstream rise ~0.6 m.

    Kathmandu Post
  3. 28 AugGyirong (Kerung) Port

    Gyirong (Kerung) Port: phones working again

    telecom articles
  4. 28 AugUpper Trishuli-1 camp (Mailung/Haku)

    350 workers are brought out alive from the Upper Trishuli hydropower tunnel; 100+ remain inside. 7 military and 7 civilian helicopters fly 200+ sorties.

    Kathmandu Post
  5. 28 Aug 19:00

    NDRRMA situation report: 579 dead (+190), 1,924 out of contact, 4,451 rescued

    NDRRMA
  6. 28 Aug 19:00

    145 of 198 damaged telecom towers back on air (NDRRMA)

    NDRRMA
  7. 29 AugKalikasthan primary health centre

    Kalikasthan primary health centre: phones working again

    telecom articles
  8. 29 Aug 18:30

    NDRRMA situation report: 675 dead (+96), 2,498 out of contact (+574), 7,514 rescued (+3,063)

    NDRRMA
  9. 30 Aug 16:40

    Devghat river gauge falls silent — last reading (5.01 m)

    DHM via BIPAD
  10. 30 Aug 16:50

    Dhunche river gauge falls silent — last reading (2.55 m)

    DHM via BIPAD
  11. 30 Aug 16:50

    Kali Khola river gauge falls silent — last reading (6.92 m)

    DHM via BIPAD
  12. 30 Aug 17:00

    Galchhi river gauge falls silent — last reading (361.11 m)

    DHM via BIPAD
  13. 30 Aug 18:30

    NDRRMA situation report: 781 dead (+106), 2,502 out of contact (+4), 9,435 rescued (+1,921)

    NDRRMA