Briddim
ब्रिद्दिम
mostly unknown
Rasuwa · km 10 of the corridor · 2,230 m
2
reported there
public registries + manifests · 31 Aug 10:44
0
confirmed reached
rescue logs · 31 Aug 10:44
2
unknown
reported − confirmed
—
last contact out
latest contact reported by a public source
public registries + manifests + rescue logs · as of 31 Aug 10:44
What is happening now
As of 31 Aug 10:44, there is 1 open help request, 1 critical situation, and 60 people reported affected in Briddim; 2 bridges need inspection and 1 road bridge is in the inventory.
as of 31 Aug 10:44 NPT · Sources: DoR (RIMES bridge inventory) · NESRA FloodWatch · OPMCM portal · News of Nepal · Setopati
- Phones
- —
- Access
- unknown
- Nearest gauge
- Langtang Khola — dead since 26 Aug 08:50
- Shelter
- Rasuwa: 1270 people in 12 sites (NDRRMA)
Status, day by day
- 27 Aug2 bridge(s) here flagged for inspection (NESRA FloodWatch) ↗
- 30 Augहिमचट्टान ताण्डवको दुष्प्रभाव ↗
- 30 Augरसुवा बाढीको जिम्मा पृथ्वीको तापक्रम वृद्धिमा योगदान गरेका राष्ट्रहरूले लिनुपर्छ : हरि ढकाल ↗
- 30 Augआजका समाचार : रसुवागढी बाढीपछि कृष्णभिरमा संकट, पृथ्वी राजमार्ग बन्द, रविले थाले प्रदेश र स्थानीय सरकारसँग संवाद, बालेन सरकारसँग भड्किए केपी ↗
- 30 Aug2 bridge(s) here flagged for inspection (NESRA FloodWatch) ↗
- 30 Aug1 open help request(s) here on the PM's portal (1 critical) ↗
- 30 Aug1 people reported missing here on the PM's portal ↗
- 30 Aug60 people reported affected here (PM's portal help requests) ↗
- 31 Augभदौ १५ गते सोमबार, यस्तो छ तपाईंको राशिफल ↗
- 31 Aug1 open help request(s) here on the PM's portal (1 critical) ↗
- 31 Aug1 people reported missing here on the PM's portal ↗
- 31 Aug60 people reported affected here (PM's portal help requests) ↗
Headlines mentioning Briddim
No headlines mention this place yet.
- Phones
- —
- Access
- unknown
- Nearest gauge
- Langtang Khola — dead since 26 Aug 08:50
- Shelter
- Rasuwa: 1270 people in 12 sites (NDRRMA)
ON THE CORRIDOR
km 10 of 72 · between Ghattekhola (km 8) and Chilime Hydropower (22 MW) (km 15) · marker on the 3D corridor on the home page.
ON THE CORRIDOR
km 10 of 72 · between Ghattekhola (km 8) and Chilime Hydropower (22 MW) (km 15) · marker on the 3D corridor on the home page.
as of 31 Aug 10:44 NPT