Mugling
मुग्लिन · मुगलिंग
no data yet
Chitwan · km 85 of the corridor · — m
0
reported there
public registries + manifests · 12 Sep 00:58
0
confirmed reached
rescue logs · 12 Sep 00:58
0
unknown
reported − confirmed
—
last contact out
latest contact reported by a public source
public registries + manifests + rescue logs · as of 12 Sep 00:58
What is happening now
As of 12 Sep 00:58, the latest headline on 11 Sep is: “भदौ मसान्तसम्म कृष्णभिरमा आवागमन खुलाउने तयारी, दैनिक 14 घण्टा काम” (Onlinekhabar).
as of 12 Sep 00:58 NPT · Sources: Onlinekhabar
- Phones
- —
- Access
- road
- Nearest gauge
- Malekhu — dead since 26 Aug 11:40
- Shelter
- —
Status, day by day
- 26 Augबाढी पूर्वानुमान महाशाखाले भन्यो : भोटेकोशीको बाढी गल्छीआसपास पुग्यो ↗
- 26 Aug११ बजे राष्ट्रिय विपद परिषदकाे बैठक बस्दै ↗
- 27 AugMSF team in Nepal ↗
- 27 AugNepal Flash Floods: Rapid Situation Overview (27 August 2026) ↗
- 27 Augभोटेकोशी बाढी : बाढी पूर्वानुमान महाशाखाले पठाएको थियो ७ लाख एसएमएस ↗
- 28 AugNepal Catastrophic Flash Flood Rasuwa-Trishuli, Nepal (26 August 2026) ↗
- 28 AugNDRRMA स्थिति प्रतिवेदन #०६ (भदौ ११, राति १०:०० बजेसम्म) / Situation Report #06 ↗
- 28 Augबाढी स्याप्रुबेसी आइपुग्यो, मुग्लिनसम्म उच्च सतर्कता अपनाउनु · राष्ट्रिय पोर्टल ↗
- 28 Augनारायणगढ-मुग्लिन-काठमाडौं सडक शुक्रबार साँझदेखि एकतर्फी सञ्चालनमा ↗
- 29 Augबाढी–पहिरोका कारण कुन सडक तथा राजमार्गमा अवरोध छ ? ↗
- 30 Augकृष्णभिरको पहिरोले पृथ्वी राजमार्ग ठप्प, यी हुन् दुई वैकल्पिक रुट ↗
- 30 Augकृष्णभीरमा बाढीले कटान गरेपछि काठमाडौं-मुग्लिन सडक पूर्णरूपमा अवरुद्ध ↗
- 30 Augभोटेकोशी बाढीको प्रभाव चितवन आइपुग्दा घट्यो ↗
- 30 Augअवरुद्ध काठमाडौं-मुग्लिन-नारायणगढ सडक पूर्णरूपमा सञ्चालन ↗
- 30 AugAlternative route ensures fuel and LPG supply to Kathmandu ↗
- 30 AugTraffic Resumes on Narayangadh-Mugling and Prithvi Highway After Flood Scare ↗
- 30 Augकृष्णभीरमा सडक भासिँदा मुग्लिङ–काठमाडौं सडक पूर्ण रूपमा अवरुद्ध ↗
- 30 AugKrishna Bhir landslide blocks Muglin-Kathmandu road, repairs may take a month ↗
- 30 AugKrishnabhir road sinks, Kathmandu-Muglin highway fully blocked ↗
- 30 AugNarayangadh-Muglin, Pokhara and Kathmandu roads fully closed after fresh flood threat ↗
- 30 AugTrucks stranded in Kalanki after flood damages road at Krishnabhir ↗
- 30 AugKathmandu-Muglin road completely blocked by floods ↗
- 30 AugUpdate: Traffic resumes on Narayangadh-Mugling routes after Bhote Koshi flood scare ↗
- 30 Augल्हेन्दे खोलामा पुनः भीषण बाढी, नारायणगढ–मुग्लिङ हुँदै काठमाडौं र पोखरा जाने सडक ठप्प ↗
- 30 Augरसुवाबाट पुनः बाढीपहिरो आएको सूचनापछि नारायणगढ–मुग्लिन सडक बन्द ↗
- 30 AugTraffic resumes on Narayangadh, Muglin and Kathmandu routes ↗
- 30 AugRoad Blocked in Dhading Due to Landslide ↗
- 30 AugDepartment conducts technical study of road washed away at Krishna Bhir ↗
- 30 Augत्रसित छन् राजमार्गका स्थानीय, कृष्णभिरको पहिरोले झनै थप्यो (तस्वीरहरू) ↗
- 30 Augभोटेकोशीमा पुनः आएको बाढीको बहाव नारायणीमा पुग्दा खतराको तहभन्दा कम ↗
- 30 Augबाढीले काठमाडौं–मुग्लिन सडक पूर्णरूपमा अवरुद्ध ↗
- 30 AugKathmandu-Muglin-Narayangadh road section fully reopened after brief closure ↗
- 30 Augकृष्णभिरमा भासिएको सडकको प्राविधिक अध्ययन गर्दै विभाग ↗
- 30 AugMugling–Kathmandu road section completely blocked at Krishnabhir ↗
- 31 AugReconnecting Rasuwa could take weeks after floods destroy key bridges ↗
- 31 Augकाठमाडौँ–मुग्लिन सडकखण्ड अवरुद्ध (फोटो फिचर) ↗
- 31 Augकोरला नाका सञ्चालन चुनौती, जीर्ण सडकले महँगो ढुवानी ↗
- 1 SepPareba Bhir road caves in, diversion opened cutting adjacent steep in Prithvi Highway ↗
- 2 SepKrishnabhir section of Prithvi Highway will be operational within this month: PM Shah ↗
- 2 Sepपृथ्वी राजमार्गको कृष्णभिर खण्डसडक यही महिनाभित्रै सञ्चालन गरिन्छः प्रधानमन्त्री ↗
- 2 SepNagdhunga tunnel opens as road subsidence disrupts traffic ↗
- 3 Sepकृष्णभिरमा नयाँ ट्र्याक खन्न सुरु ↗
- 3 SepKrishna Bhir Landslide Blocks Prithvi Highway ↗
- 3 SepTree cutting begins on hill above Krishnabhir to prepare alternative road route ↗
- 4 Sep53 suspension bridges damaged from Timure to Muglin, repairs underway on 20 ↗
- 4 SepRepair of flood-damaged suspension bridges begins ↗
- 5 SepPM Shah underscores collaboration to build human trafficking-free society ↗
- 5 SepNational Day Against Human Trafficking: Technology and Vigilance are Key ↗
- 5 Sepकृष्णभिरमा डाइभर्सनका लागि कटान सुरु ↗
- 5 Sepशनिबार बेलुकासम्म कृष्णभीरको ‘ट्र्याक’ खोल्ने तयारी ↗
- 5 SepRepair of Flood-Damaged Suspension Bridges Begins ↗
- 6 Sepनारायणगढ-मुग्लिन सडक सोमाबरदेखि आंशिक बन्द ↗
- 6 Sepनारायणगढ–मुग्लिन सडक सोमबारदेखि आंशिक बन्द हुने ↗
- 6 Sepकृष्णभीरमा खोलिएको ‘ट्र्याक’ लाई फराकिलो बनाइँदै ↗
- 6 Sepकृष्णभीरमा खोलिएको ‘ट्र्याक’ लाई फराकिलो बनाइँदै ↗
- 6 SepNarayangadh-Muglin road section to face partial closures starting Monday ↗
- 6 Sepकृष्णभिरमा खोलिएको ‘ट्र्याक’ लाई फराकिलो बनाइँदै ↗
- 6 SepFour arrested in connection with marijuana smuggling from Thailand ↗
- 7 Sepनारायणगढ–मुग्लिन सडक खण्ड आजदेखि आंशिक बन्द ↗
- 7 Sepनारायणगढ–मुग्लिन सडकखण्ड दैनिक ५ घण्टा बन्द हुने, यस्तो छ तालिका ↗
- 7 SepNarayangadh-Muglin road to face partial closures from today ↗
- 7 SepMuglin-Kathmandu Road Section's Krishnabhir Closed for Repair ↗
- 9 Sepप्रतिसेकेन्ड ५० मिटर गतिको बाढीले कहाँ के–के बिगार गर्यो ? (भिडियो) ↗
- 9 Sepनारायणगढ–हेटौंडा सडक विस्तारलाई ठेक्का आह्वान, मुग्लिन–आँबुखैरेनीमा छिट्टै ↗
- 11 Sepभदौ मसान्तसम्म कृष्णभिरमा आवागमन खुलाउने तयारी, दैनिक १४ घण्टा काम ↗
Headlines mentioning Mugling
- 11 Sepभदौ मसान्तसम्म कृष्णभिरमा आवागमन खुलाउने तयारी, दैनिक १४ घण्टा कामOnlinekhabar
- Phones
- —
- Access
- road
- Nearest gauge
- Malekhu — dead since 26 Aug 11:40
- Shelter
- —
ON THE CORRIDOR
km 85 of 72 · between Benighat (km 74) and Devghat (km 100) · marker on the 3D corridor on the home page.
ON THE CORRIDOR
km 85 of 72 · between Benighat (km 74) and Devghat (km 100) · marker on the 3D corridor on the home page.
as of 12 Sep 00:58 NPT